99色精品-9色在线-99色在线-99色视频 国产欧美日产一区二区三区_亚洲精品亚洲人成在线观看_四虎在线精品永久观看_免费一级a一片久久精

單項(xiàng)選擇題

Which of the following statements is correct for the design and installation of diesel engine cooling water systems?()

A.An alarm device with audible and visible signals is required for all cooling water systems
B.Propulsion engines with bores over 200 mm are to be fitted with cooling water jackets
C.Each totally enclosed cooling system shall be provided with a suitable head tank
D.Drain cocks are to be provided at the lowest points of all cylinder water jackets

微信掃碼免費(fèi)搜題