99色精品-9色在线-99色在线-99色视频 国产欧美日产一区二区三区_亚洲精品亚洲人成在线观看_四虎在线精品永久观看_免费一级a一片久久精

單項(xiàng)選擇題

The network administrator has discovered that the power supply has failed on a switch in the company LAN and that the switch has stopped functioning. It has been replaced with a Cisco Catalyst 2950 series switch. What must be done to ensure that this new switch becomes the root bridge on the network?()

A. Lower the bridge priority number.
B. Change the MAC address of the switch.
C. Increase the VTP revision number for the domain.
D. Lower the root path cost on the switch ports.
E. Assign the switch an IP address with the lowest value.

微信掃碼免費(fèi)搜題